How offsite timber systems are applied across 16 Western Sydney sites.
Green Timber Technology (GTT) is continuing to build out its offsite residential construction operations from Orange, New South Wales, with a focus on repeatable housing delivery for government and community clients. The manufacturer is currently delivering 32 Homes NSW dwellings across 16 sites in Western Sydney under a $24 million Design and Construct contract, forming part of the NSW Government’s $6.6 billion Building Homes for NSW program. (main image: Factory-manufactured wall panel installed on a Homes NSW social housing project in Western Sydney, using GTT’s kit-of-parts offsite construction system to support multi-site residential delivery.)


The Western Sydney project comprises 14 duplexes and two dual-living homes, delivering 32 four-bedroom residences designed to support families and multi-generational households. All homes are being delivered using GTT’s kit-of-parts construction system, with floor, wall and roof panels manufactured offsite before installation across multiple suburban locations.
Founded in 2021, GTT was established to address inefficiencies in residential construction through Design for Manufacture and Assembly (DfMA). Chief executive Pete Morrison said the company’s early priority was to establish dependable systems before pursuing broader expansion.
“We wanted to ensure the fundamentals were right,” Morrison said. “That means design certainty, manufacturing consistency and delivery outcomes that can be repeated across multiple sites.”

Kit-of-parts model shaped by delivery experience
Morrison brings international experience to the business, having previously worked with German prefabricated housing manufacturer Huf Haus in the UK, as well as with School Infrastructure NSW. He said those roles reinforced the importance of integrated systems and disciplined delivery.
“There was demand for offsite construction in New South Wales, but supply chains were fragmented,” he said. “That gap influenced how we structured the kit-of-parts model from the outset.”

Central to GTT’s approach is the use of lightweight, timber-framed panels assembled in a controlled factory environment. The system is designed for two- to five-storey residential applications and is intended to reduce onsite labour requirements while improving consistency across repeat builds.
Partnerships supporting residential delivery
GTT’s operations are supported through partnerships with Brightlands Living and Pentarch Group, providing a secured residential project pipeline and access to locally sourced timber. Located near New South Wales’ central forestry hub, the Orange facility allows shorter supply chains and reduced transport distances.

Sustainability forms part of the company’s operating framework, with an emphasis on responsible timber sourcing and material efficiency. According to GTT, this approach aligns with the requirements of government housing programs seeking predictable delivery alongside reduced material waste.
GTT’s current work is concentrated on residential projects delivered through its kit-of-parts system, with manufacturing and installation coordinated from its Orange facility across multiple sites in New South Wales.
Find GTT HERE