Malaysia Trains 9,375 in BIM to Accelerate Construction Digitalisation

BIM capability expansion signals structural reform in Malaysia’s construction sector under the 13th Malaysia Plan.

Malaysia is expanding its Building Information Modelling capability as part of a broader strategy to modernise the construction sector, with 9,375 participants having completed BIM training through the myBIM Centre and the nationwide myBIM Satellite network.

Works Minister Datuk Seri Alexander Nanta Linggi said the total includes participants who undertook phased programmes delivered by the Construction Industry Development Board Malaysia (CIDB). The figure reflects a structured approach to capability building, extending beyond major consultancies to contractors and smaller firms.

BIM as the digital foundation for industrialised construction

Alexander Nanta described BIM as an integrated method that enables systematic planning, coordination and lifecycle management. By identifying technical clashes and sequencing issues early, BIM reduces rework, delays and cost overruns.

In Malaysia, BIM is closely aligned with what is termed the Industrialised Building System. In Australia, equivalent approaches are typically described as offsite, prefabricated and modular construction, or grouped under the umbrella of modern methods of construction, a category that continues to develop in scope and definition. Despite differences in terminology, the requirement is the same. Manufacturing led construction depends on coordinated, production ready digital information before components enter factory environments.

Seen in this context, BIM functions as a structured data platform. It connects architectural, structural and services information in a format that supports fabrication, logistics and staged onsite assembly. Without that digital coordination, industrialised construction methods are difficult to standardise or scale across multiple projects.

The policy direction is reinforced in the 13th Malaysia Plan (2026 to 2030), which sets out Malaysia’s strategic framework for economic transformation. The plan allocates RM430 billion (AUD $140 billion) in government funding as part of a broader RM611 billion (AUD $198 billion) development programme.

Importantly, the plan introduces a new mechanism to manage project costs based on life cycle analysis. Projects above RM300 million (AUD $97 million) will undergo detailed evaluation, and the Public Sector Comparator financial model will be updated. BIM will be mandatory for projects exceeding RM10 million (AUD $3.2 million), while adoption of Malaysia’s Industrialised Building System framework will be expanded, particularly in public housing.

Within the 13MP, the construction sector is expected to contribute to projected GDP growth of 4.5% to 5.5% per annum between 2026 and 2030. Achieving that target will depend in part on improved coordination, cost discipline and productivity across project lifecycles.

The combination of scaled BIM training and formal procurement requirements suggests a clear policy to align digital modelling, industrialised construction and fiscal reform within a single policy framework.

Find 13th Malaysia Plan (pdf) HERE