Intrastack steel-frame system for offsite construction

New steel-frame system launched for offsite construction

UK-based Intrastack, part of Saint Gobain’s OffSite Solutions division, launches panelised steel-frame system.

Positioning itself as a new, panelised, light gauge steel frame solution has been designed to help contractors and housebuilders deliver multi-storey, multi-occupancy residential and commercial projects. Intrastack’s system, according to company sources, can deliver a full, steel-frame building structure of up to 12 storeys high, claiming greater efficiency and reducing the need for extensive on-site construction works.

The steel frame system is available with either LGSF (light gauge steel frame) cassette mid-floors and roofs or composite concrete floors and roofs. Following comprehensive fire resistance and acoustics testing, the steel frame systems will provide 120 minutes of fire performance.

The new panelised steel frame system can be adapted to suit any standard or complex requirements of a build. Building typologies include: hotels, apartments, student or low-rise housing.

Intrastack suggest their new LGSF system will speed of construction by up to 50 per cent in comparison to traditional methods.

Each panel is manufactured and assembled at Saint-Gobain Off-Site Solution’s 15+ acre, multi-disciplined MMC (modern methods of construction) facility in the North-West of England.

Andy Higson, Business Director at Intrastack, said: “Following extensive market research, it was clear that clients, developers, and contractors required clarity around four key factors when considering a new system. Firstly, the solution must perform well and be tested, manufactured and assembled in a controlled factory setting.

“Secondly, accurate information on exact tolerances must be communicated; thirdly, the system must be quick to erect and integral in speeding up the wider construction programme.

Finally, costs must be accurate and clear. By working closely with our existing customers across multiple schemes, it is clear that we’ve delivered on market requirements and will continue to retain our keen focus on innovation and developing further MMC solutions.

“We work closely with our customers at the earliest stages of a project, we support concept ideation, detailed system design, installation, and ongoing interaction with associated follow-on trades.”

See: www.saint-gobain.co.uk/intrastack



CLICK HERE to return to the home page for more articles.

Sign up to the Built Offsite Newsletter

loading