Case Studies

PRECAST CASE STUDY: MODA THE H...

PRECAST CONCRETE HAS BEEN SELECTED AS THE OPTIMAL SOLUTION FOR…
Forming part of an overall effort to improve the neighbourhoods of Sydney’s North West by bringing vibrant green spaces, cycling and walking trails and shopping districts to multiple communities, the... READ MORE

STEEL FRAMING BRACES HEALTHCAR...

OFFSITE SOLUTIONS FROM STEEL FRAMING SPECIALIST EOS HAVE PROVEN CRITICAL…
Named after the Lincolnshire born Dame Sarah Swift, who founded the Royal College of Nursing, the 5,500 square metre £19 million Sarah Swift Building at the University of Lincoln accommodates... READ MORE

CASE STUDY: 18 AT CHATSWOOD

THE USE OF TWO KEY PRODUCTS ON A BOUTIQUE RESIDENTIAL…
Located in Chatswood, Sydney, 18 at Chatswood is a seven storey building designed by Mayoh Architects and built by Novati Constructions, comprising one and two-bedroom apartments and three-bedroom penthouses. Situated... READ MORE

LIGHTWEIGHT TIMBER SCHEME SETS...

A CASE STUDY FROM WOODSOLUTIONS ON THE OXFORD APARTMENT SCHEME…
Around 20km west of Melbourne's CBD, Williams Landing (from residential developer Cedar Woods) is a 225-hectare master planned community of 2,400 characterised by state of the art transport, amenities and... READ MORE

SACRED UK BUILDING A FEAT OF E...

A LANDMARK TIMBER PROJECT AND MULTI-AWARD WINNER AT THE 2019…
The newly constructed Cambridge Mosque's main features are its gold clad dome and the vast timber structure, which was designed and manufactured by BlumerLehmann AG in Gossau, Switzerland. The mosque... READ MORE

INNOVATIVE SYSTEM SUPPORTS INN...

PEIKKO GROUP IS A LEADING GLOBAL SUPPLIER OF SLIM FLOOR…
Trent Davis, Managing Director, Peikko Australia, confirms Peikko's innovative solutions offer a faster, safer, more sustainable and more efficient way to design and build. "Peikko aims to change the construction... READ MORE

PPA SMART BASE + FAST HOOK OPT...

THE NEW SMART BASE AND FAST HOOK SYSTEM FROM BATHROOM…
With the cost of installing bathrooms and minimising hook time for the head contractor a primary factor in Platinum Pacific Australia’s lifecycle design, PPA has developed its bottom up installation... READ MORE

LEDINEK IN ACTION AT XLAM

A GRANULAR LOOK AT THE PROCESSES USED BY XLAM'S CROSS-LAMINATED…
XLam has developed a profile as a leading proponent of CLT in the southern hemisphere, in particular through collaboration on ground-breaking projects with high recall construction companies such as Lendlease.... READ MORE

DYNAMIC PODS

DYNAMIC PODS' OFFERING IS BUILT AROUND A QUALITY, SEAMLESS INTEGRATION…
Dynamic Pods use state-of-the-art light gauge steel frames with millimetre value accuracy to ensure 100 per cent repeatability. The light gauge steel frame exterior is pre-punched for electrical and plumbing... READ MORE

PLATINUM PACIFIC AUSTRALIA

PLATINUM PACIFIC AUSTRALIA (PPA) HAS A VISION TO RE-IMAGINE MODULAR…
https://www.youtube.com/watch?v=EfXo5EtAq_c Drawing on over 30 years' experience in offsite construction and prefabrication, the company operates multiple global assembly facilities, now including Australia, and has a growing global customer base that... READ MORE
← Newer
Older →

Sign up to the Built Offsite Newsletter

loading